{"id":82297,"date":"2026-06-09T16:49:04","date_gmt":"2026-06-09T16:49:04","guid":{"rendered":"https:\/\/loginfo24.com\/2026\/06\/09\/identifying-risks-in-bid-evaluation\/"},"modified":"2026-06-09T20:25:25","modified_gmt":"2026-06-09T18:25:25","slug":"identifying-risks-in-bid-evaluation","status":"publish","type":"post","link":"https:\/\/loginfo24.com\/en\/2026\/06\/09\/identifying-risks-in-bid-evaluation\/","title":{"rendered":"Identifying Risks in Bid Evaluation"},"content":{"rendered":"<p>(PresseBox) The evaluation of bids in procurement processes is a critical step that often determines the success of a project. According to agiplan ag, a company of the T&amp;O Group, many problems arise not during implementation but already in the bid evaluation phase. The main focus is often on the formal equivalence of the bids, which can lead to significant risks.<\/p>\n<h3>Risks in Bid Evaluation<\/h3>\n<p>In many tenders, bids are evaluated based on classic criteria such as price, delivery time, and technical metrics. However, these formal comparisons can be misleading. Critical deviations are often not immediately apparent, as they are hidden in assumptions, calculation methods, or technical interpretations that are not transparently presented in the bids. This is particularly evident in complex logistics and automation projects, where a mere bid comparison is insufficient to assess the actual technical suitability of a provider.<\/p>\n<p>A practical example illustrates this problem: A provider may meet the required performance values for an automated storage system, but the test points used do not reflect real operating conditions. The calculations are based on simplified scenarios that do not consider the actual challenges in operation. This leads to the promised throughput not being achieved, resulting in conflicts between the client and the provider.<\/p>\n<h3>Contractual Safeguards Are Not Sufficient<\/h3>\n<p>To protect against such risks, many companies attempt to establish contractual regulations. Often, the contract specifies that the tender takes precedence over the bid. While this approach is legally justifiable, it does not resolve all technical issues. A provider may formally respond correctly to a tender and still offer a solution that does not meet the actual requirements. If such weaknesses are not identified before the award, they can lead to significant additional costs during the project.<\/p>\n<p>Thus, the critical phase lies not in implementation but between the submission of bids and the signing of contracts. A thorough bid review is therefore essential.<\/p>\n<h3>The Necessity of a Thorough Bid Review<\/h3>\n<p>A professional bid review should go beyond merely checking positions and prices. It must question the technical robustness of the bid. Important aspects include the assumptions underlying the calculations, the realism of the scenarios used, and deviations from the required standard. Additionally, it is crucial to determine which performance values are actually verifiable and what risks may arise in later operations.<\/p>\n<p>Particularly in automated material flow and logistics systems, deep practical knowledge is required to assess the robustness of runtime calculations and identify critical load cases. This also applies to software and interface requirements, which may initially appear complete but overlook central process or integration requirements.<\/p>\n<p>\u201cThe tender defines the framework. But only a technically sound review of the bid shows whether the provider truly understands the requirements,\u201d explains Remo Eggimann, Managing Director of agiplan.ch.<\/p>\n<p>The investment in a thorough technical bid review is small compared to the subsequent costs of erroneous awards. Many of the most expensive mistakes occur not during realization but already in the award decisions based on insufficient evaluation criteria. A careful tender remains important but does not replace the necessary expertise for the technical evaluation of bids.<\/p>\n<p><a href=\"http:\/\/www.agiplan.ch\" target=\"_blank\" rel=\"noopener noreferrer\">www.agiplan.ch<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>According to agiplan ag, thorough technical bid reviews are crucial to minimize risks in bid evaluation and to avoid costly mistakes during project implementation.<\/p>\n","protected":false},"author":7,"featured_media":82298,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[6679,6675,23333,6677],"tags":[30428,30429,30430,30431,30432,30433,30434,30435,30436,30437,30438,30439,30440,30441,30442,30443,30444,30445,30446,30447,30448,30449,30450,30451,30452,30453,30454,30455,30456,30457,30458,30459,30460,30461,30462,30463,30464,30465,30466,30467,30468,30469,30470,30471,30472,30473,30474,30475,30476],"class_list":["post-82297","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-europa","category-germany","category-it-e-commerce","category-switzerland","tag-abweichungen-technische-standards","tag-additional-costs-due-to-weaknesses","tag-adequation-technique-fournisseur","tag-angebotsabgabe-und-vertragsunterzeichnung-english-offer-evaluation-risks","tag-angebotsbewertung-logistik","tag-angebotsvergleich-risiken","tag-appel-doffres-et-offre","tag-ausschreibung-anforderungen","tag-ausschreibung-und-angebot","tag-automated-system-offer-review","tag-connaissances-pratiques-examen-des-offres","tag-contractual-regulations-work-contract","tag-couts-supplementaires-dus-a-des-faiblesses","tag-delai-de-livraison-et-comparaison-des-prix","tag-delivery-time-and-price-comparison","tag-deutsch-risiken-bei-der-angebotsbewertung","tag-deviations-technical-standards","tag-ecarts-normes-techniques","tag-evaluation-des-offres-logistique","tag-examen-des-offres-systemes-automatises","tag-exigences-de-lappel-doffres","tag-expertise-evaluation-technique","tag-expertise-technical-assessment","tag-fachkompetenz-technische-bewertung","tag-faisabilite-technique-des-offres","tag-lieferzeit-und-preisvergleich","tag-logistics-and-automation-projects","tag-logistik-und-automatisierungsprojekte","tag-material-flow-and-logistics-systems","tag-materialfluss-und-logistiksysteme","tag-mehrkosten-durch-schwachstellen","tag-offer-comparison-risks","tag-offer-evaluation-logistics","tag-offer-submission-and-contract-signing-francais-risques-devaluation-des-offres","tag-offertpruefung-automatisierte-systeme","tag-practical-knowledge-offer-review","tag-praxiswissen-offertpruefung","tag-projets-logistiques-et-dautomatisation","tag-reglementations-contractuelles-contrat-de-travail","tag-risques-de-comparaison-des-offres","tag-soumission-doffres-et-signature-de-contrat","tag-systemes-de-flux-de-materiaux-et-logistique","tag-technical-feasibility-offers","tag-technical-suitability-provider","tag-technische-belastbarkeit-angebote","tag-technische-eignung-anbieter","tag-tender-and-offer","tag-tender-requirements","tag-vertragliche-regelungen-werkvertrag"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Identifying Risks in Bid Evaluation - Loginfo24<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/loginfo24.com\/en\/2026\/06\/09\/identifying-risks-in-bid-evaluation\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Identifying Risks in Bid Evaluation - Loginfo24\" \/>\n<meta property=\"og:description\" content=\"According to agiplan ag, thorough technical bid reviews are crucial to minimize risks in bid evaluation and to avoid costly mistakes during project implementation.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/loginfo24.com\/en\/2026\/06\/09\/identifying-risks-in-bid-evaluation\/\" \/>\n<meta property=\"og:site_name\" content=\"Loginfo24\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/people\/Loginfo24\/100057360583332\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-09T16:49:04+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-09T18:25:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/loginfo24.com\/wp-content\/uploads\/sites\/7\/2026\/06\/Foto_Angebotsbewertungen-aspect-ratio-1400-788.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"675\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Andreas M\u00fcller\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Andreas M\u00fcller\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/loginfo24.com\\\/en\\\/2026\\\/06\\\/09\\\/identifying-risks-in-bid-evaluation\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/loginfo24.com\\\/en\\\/2026\\\/06\\\/09\\\/identifying-risks-in-bid-evaluation\\\/\"},\"author\":{\"name\":\"Andreas M\u00fcller\",\"@id\":\"https:\\\/\\\/loginfo24.com\\\/en\\\/#\\\/schema\\\/person\\\/7b1593b33567ba798d300c8a1b0b85b1\"},\"headline\":\"Identifying Risks in Bid Evaluation\",\"datePublished\":\"2026-06-09T16:49:04+00:00\",\"dateModified\":\"2026-06-09T18:25:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/loginfo24.com\\\/en\\\/2026\\\/06\\\/09\\\/identifying-risks-in-bid-evaluation\\\/\"},\"wordCount\":524,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/loginfo24.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/loginfo24.com\\\/en\\\/2026\\\/06\\\/09\\\/identifying-risks-in-bid-evaluation\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/loginfo24.com\\\/wp-content\\\/uploads\\\/sites\\\/7\\\/2026\\\/06\\\/Foto_Angebotsbewertungen-aspect-ratio-1400-788.png\",\"keywords\":[\"Abweichungen technische Standards\",\"additional costs due to weaknesses\",\"ad\u00e9quation technique fournisseur\",\"Angebotsabgabe und Vertragsunterzeichnung English offer evaluation risks\",\"Angebotsbewertung Logistik\",\"Angebotsvergleich Risiken\",\"appel d'offres et offre\",\"Ausschreibung Anforderungen\",\"Ausschreibung und Angebot\",\"automated system offer review\",\"connaissances pratiques examen des offres\",\"contractual regulations work contract\",\"co\u00fbts suppl\u00e9mentaires dus \u00e0 des faiblesses\",\"d\u00e9lai de livraison et comparaison des prix\",\"delivery time and price comparison\",\"Deutsch Risiken bei der Angebotsbewertung\",\"deviations technical standards\",\"\u00e9carts normes techniques\",\"\u00e9valuation des offres logistique\",\"examen des offres syst\u00e8mes automatis\u00e9s\",\"exigences de l'appel d'offres\",\"expertise \u00e9valuation technique\",\"expertise technical assessment\",\"Fachkompetenz technische Bewertung\",\"faisabilit\u00e9 technique des offres\",\"Lieferzeit und Preisvergleich\",\"logistics and automation projects\",\"Logistik- und Automatisierungsprojekte\",\"material flow and logistics systems\",\"Materialfluss- und Logistiksysteme\",\"Mehrkosten durch Schwachstellen\",\"offer comparison risks\",\"offer evaluation logistics\",\"offer submission and contract signing Fran\u00e7ais risques d'\u00e9valuation des offres\",\"Offertpr\u00fcfung automatisierte Systeme\",\"practical knowledge offer review\",\"Praxiswissen Offertpr\u00fcfung\",\"projets logistiques et d'automatisation\",\"r\u00e9glementations contractuelles contrat de travail\",\"risques de comparaison des offres\",\"soumission d'offres et signature de contrat\",\"syst\u00e8mes de flux de mat\u00e9riaux et logistique\",\"technical feasibility offers\",\"technical suitability provider\",\"technische Belastbarkeit Angebote\",\"technische Eignung Anbieter\",\"tender and offer\",\"tender requirements\",\"vertragliche Regelungen Werkvertrag\"],\"articleSection\":[\"Europa\",\"Germany\",\"IT \\\/ E-Commerce\",\"Switzerland\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/loginfo24.com\\\/en\\\/2026\\\/06\\\/09\\\/identifying-risks-in-bid-evaluation\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/loginfo24.com\\\/en\\\/2026\\\/06\\\/09\\\/identifying-risks-in-bid-evaluation\\\/\",\"url\":\"https:\\\/\\\/loginfo24.com\\\/en\\\/2026\\\/06\\\/09\\\/identifying-risks-in-bid-evaluation\\\/\",\"name\":\"Identifying Risks in Bid Evaluation - Loginfo24\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/loginfo24.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/loginfo24.com\\\/en\\\/2026\\\/06\\\/09\\\/identifying-risks-in-bid-evaluation\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/loginfo24.com\\\/en\\\/2026\\\/06\\\/09\\\/identifying-risks-in-bid-evaluation\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/loginfo24.com\\\/wp-content\\\/uploads\\\/sites\\\/7\\\/2026\\\/06\\\/Foto_Angebotsbewertungen-aspect-ratio-1400-788.png\",\"datePublished\":\"2026-06-09T16:49:04+00:00\",\"dateModified\":\"2026-06-09T18:25:25+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/loginfo24.com\\\/en\\\/2026\\\/06\\\/09\\\/identifying-risks-in-bid-evaluation\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/loginfo24.com\\\/en\\\/2026\\\/06\\\/09\\\/identifying-risks-in-bid-evaluation\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/loginfo24.com\\\/en\\\/2026\\\/06\\\/09\\\/identifying-risks-in-bid-evaluation\\\/#primaryimage\",\"url\":\"https:\\\/\\\/loginfo24.com\\\/wp-content\\\/uploads\\\/sites\\\/7\\\/2026\\\/06\\\/Foto_Angebotsbewertungen-aspect-ratio-1400-788.png\",\"contentUrl\":\"https:\\\/\\\/loginfo24.com\\\/wp-content\\\/uploads\\\/sites\\\/7\\\/2026\\\/06\\\/Foto_Angebotsbewertungen-aspect-ratio-1400-788.png\",\"width\":1200,\"height\":675},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/loginfo24.com\\\/en\\\/2026\\\/06\\\/09\\\/identifying-risks-in-bid-evaluation\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/loginfo24.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Identifying Risks in Bid Evaluation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/loginfo24.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/loginfo24.com\\\/en\\\/\",\"name\":\"Loginfo24\",\"description\":\"Loginfo24 is the platform for logistics and supply chains, providing information around the clock.\",\"publisher\":{\"@id\":\"https:\\\/\\\/loginfo24.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/loginfo24.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/loginfo24.com\\\/en\\\/#organization\",\"name\":\"Logismedia Group AG\",\"url\":\"https:\\\/\\\/loginfo24.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/loginfo24.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/loginfo24.com\\\/wp-content\\\/uploads\\\/sites\\\/7\\\/2026\\\/01\\\/Logo_LogInfo24.png\",\"contentUrl\":\"https:\\\/\\\/loginfo24.com\\\/wp-content\\\/uploads\\\/sites\\\/7\\\/2026\\\/01\\\/Logo_LogInfo24.png\",\"width\":938,\"height\":351,\"caption\":\"Logismedia Group AG\"},\"image\":{\"@id\":\"https:\\\/\\\/loginfo24.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/people\\\/Loginfo24\\\/100057360583332\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/lofinfo24\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/loginfo24.com\\\/en\\\/#\\\/schema\\\/person\\\/7b1593b33567ba798d300c8a1b0b85b1\",\"name\":\"Andreas M\u00fcller\",\"url\":\"https:\\\/\\\/loginfo24.com\\\/en\\\/author\\\/logismedia\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Identifying Risks in Bid Evaluation - Loginfo24","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/loginfo24.com\/en\/2026\/06\/09\/identifying-risks-in-bid-evaluation\/","og_locale":"en_US","og_type":"article","og_title":"Identifying Risks in Bid Evaluation - Loginfo24","og_description":"According to agiplan ag, thorough technical bid reviews are crucial to minimize risks in bid evaluation and to avoid costly mistakes during project implementation.","og_url":"https:\/\/loginfo24.com\/en\/2026\/06\/09\/identifying-risks-in-bid-evaluation\/","og_site_name":"Loginfo24","article_publisher":"https:\/\/www.facebook.com\/people\/Loginfo24\/100057360583332\/","article_published_time":"2026-06-09T16:49:04+00:00","article_modified_time":"2026-06-09T18:25:25+00:00","og_image":[{"width":1200,"height":675,"url":"https:\/\/loginfo24.com\/wp-content\/uploads\/sites\/7\/2026\/06\/Foto_Angebotsbewertungen-aspect-ratio-1400-788.png","type":"image\/png"}],"author":"Andreas M\u00fcller","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Andreas M\u00fcller","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/loginfo24.com\/en\/2026\/06\/09\/identifying-risks-in-bid-evaluation\/#article","isPartOf":{"@id":"https:\/\/loginfo24.com\/en\/2026\/06\/09\/identifying-risks-in-bid-evaluation\/"},"author":{"name":"Andreas M\u00fcller","@id":"https:\/\/loginfo24.com\/en\/#\/schema\/person\/7b1593b33567ba798d300c8a1b0b85b1"},"headline":"Identifying Risks in Bid Evaluation","datePublished":"2026-06-09T16:49:04+00:00","dateModified":"2026-06-09T18:25:25+00:00","mainEntityOfPage":{"@id":"https:\/\/loginfo24.com\/en\/2026\/06\/09\/identifying-risks-in-bid-evaluation\/"},"wordCount":524,"commentCount":0,"publisher":{"@id":"https:\/\/loginfo24.com\/en\/#organization"},"image":{"@id":"https:\/\/loginfo24.com\/en\/2026\/06\/09\/identifying-risks-in-bid-evaluation\/#primaryimage"},"thumbnailUrl":"https:\/\/loginfo24.com\/wp-content\/uploads\/sites\/7\/2026\/06\/Foto_Angebotsbewertungen-aspect-ratio-1400-788.png","keywords":["Abweichungen technische Standards","additional costs due to weaknesses","ad\u00e9quation technique fournisseur","Angebotsabgabe und Vertragsunterzeichnung English offer evaluation risks","Angebotsbewertung Logistik","Angebotsvergleich Risiken","appel d'offres et offre","Ausschreibung Anforderungen","Ausschreibung und Angebot","automated system offer review","connaissances pratiques examen des offres","contractual regulations work contract","co\u00fbts suppl\u00e9mentaires dus \u00e0 des faiblesses","d\u00e9lai de livraison et comparaison des prix","delivery time and price comparison","Deutsch Risiken bei der Angebotsbewertung","deviations technical standards","\u00e9carts normes techniques","\u00e9valuation des offres logistique","examen des offres syst\u00e8mes automatis\u00e9s","exigences de l'appel d'offres","expertise \u00e9valuation technique","expertise technical assessment","Fachkompetenz technische Bewertung","faisabilit\u00e9 technique des offres","Lieferzeit und Preisvergleich","logistics and automation projects","Logistik- und Automatisierungsprojekte","material flow and logistics systems","Materialfluss- und Logistiksysteme","Mehrkosten durch Schwachstellen","offer comparison risks","offer evaluation logistics","offer submission and contract signing Fran\u00e7ais risques d'\u00e9valuation des offres","Offertpr\u00fcfung automatisierte Systeme","practical knowledge offer review","Praxiswissen Offertpr\u00fcfung","projets logistiques et d'automatisation","r\u00e9glementations contractuelles contrat de travail","risques de comparaison des offres","soumission d'offres et signature de contrat","syst\u00e8mes de flux de mat\u00e9riaux et logistique","technical feasibility offers","technical suitability provider","technische Belastbarkeit Angebote","technische Eignung Anbieter","tender and offer","tender requirements","vertragliche Regelungen Werkvertrag"],"articleSection":["Europa","Germany","IT \/ E-Commerce","Switzerland"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/loginfo24.com\/en\/2026\/06\/09\/identifying-risks-in-bid-evaluation\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/loginfo24.com\/en\/2026\/06\/09\/identifying-risks-in-bid-evaluation\/","url":"https:\/\/loginfo24.com\/en\/2026\/06\/09\/identifying-risks-in-bid-evaluation\/","name":"Identifying Risks in Bid Evaluation - Loginfo24","isPartOf":{"@id":"https:\/\/loginfo24.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/loginfo24.com\/en\/2026\/06\/09\/identifying-risks-in-bid-evaluation\/#primaryimage"},"image":{"@id":"https:\/\/loginfo24.com\/en\/2026\/06\/09\/identifying-risks-in-bid-evaluation\/#primaryimage"},"thumbnailUrl":"https:\/\/loginfo24.com\/wp-content\/uploads\/sites\/7\/2026\/06\/Foto_Angebotsbewertungen-aspect-ratio-1400-788.png","datePublished":"2026-06-09T16:49:04+00:00","dateModified":"2026-06-09T18:25:25+00:00","breadcrumb":{"@id":"https:\/\/loginfo24.com\/en\/2026\/06\/09\/identifying-risks-in-bid-evaluation\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/loginfo24.com\/en\/2026\/06\/09\/identifying-risks-in-bid-evaluation\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/loginfo24.com\/en\/2026\/06\/09\/identifying-risks-in-bid-evaluation\/#primaryimage","url":"https:\/\/loginfo24.com\/wp-content\/uploads\/sites\/7\/2026\/06\/Foto_Angebotsbewertungen-aspect-ratio-1400-788.png","contentUrl":"https:\/\/loginfo24.com\/wp-content\/uploads\/sites\/7\/2026\/06\/Foto_Angebotsbewertungen-aspect-ratio-1400-788.png","width":1200,"height":675},{"@type":"BreadcrumbList","@id":"https:\/\/loginfo24.com\/en\/2026\/06\/09\/identifying-risks-in-bid-evaluation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/loginfo24.com\/en\/"},{"@type":"ListItem","position":2,"name":"Identifying Risks in Bid Evaluation"}]},{"@type":"WebSite","@id":"https:\/\/loginfo24.com\/en\/#website","url":"https:\/\/loginfo24.com\/en\/","name":"Loginfo24","description":"Loginfo24 is the platform for logistics and supply chains, providing information around the clock.","publisher":{"@id":"https:\/\/loginfo24.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/loginfo24.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/loginfo24.com\/en\/#organization","name":"Logismedia Group AG","url":"https:\/\/loginfo24.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/loginfo24.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/loginfo24.com\/wp-content\/uploads\/sites\/7\/2026\/01\/Logo_LogInfo24.png","contentUrl":"https:\/\/loginfo24.com\/wp-content\/uploads\/sites\/7\/2026\/01\/Logo_LogInfo24.png","width":938,"height":351,"caption":"Logismedia Group AG"},"image":{"@id":"https:\/\/loginfo24.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/people\/Loginfo24\/100057360583332\/","https:\/\/www.linkedin.com\/company\/lofinfo24\/"]},{"@type":"Person","@id":"https:\/\/loginfo24.com\/en\/#\/schema\/person\/7b1593b33567ba798d300c8a1b0b85b1","name":"Andreas M\u00fcller","url":"https:\/\/loginfo24.com\/en\/author\/logismedia\/"}]}},"_links":{"self":[{"href":"https:\/\/loginfo24.com\/en\/wp-json\/wp\/v2\/posts\/82297","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/loginfo24.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/loginfo24.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/loginfo24.com\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/loginfo24.com\/en\/wp-json\/wp\/v2\/comments?post=82297"}],"version-history":[{"count":1,"href":"https:\/\/loginfo24.com\/en\/wp-json\/wp\/v2\/posts\/82297\/revisions"}],"predecessor-version":[{"id":82305,"href":"https:\/\/loginfo24.com\/en\/wp-json\/wp\/v2\/posts\/82297\/revisions\/82305"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/loginfo24.com\/en\/wp-json\/wp\/v2\/media\/82298"}],"wp:attachment":[{"href":"https:\/\/loginfo24.com\/en\/wp-json\/wp\/v2\/media?parent=82297"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/loginfo24.com\/en\/wp-json\/wp\/v2\/categories?post=82297"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/loginfo24.com\/en\/wp-json\/wp\/v2\/tags?post=82297"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}